Work flow - Screed, concrete

  1. If necessary, level the floor with floor levelling compound
  2. Completely coat with undercoat/primer or sealant once – allow to dry
  3. Apply undercoat/primer (max. 1m²) and scatter granules – allow to dry
  4. Wipe off excess – seal
  5. Scatter more on the sealant if necessary (spots)
  6. Wipe off again (sandpaper if necessary) – seal three times